Brunnenbau Conrad SL has successfully completed the construction of a productive drilled borehole, two towers, and a control room at the Waterloo Female Correctional Center. The project also included the installation of a solar-powered Lorentz pump with inverters, improving the facility’s water supply system with sustainable, energy-efficient solutions. This project was commissioned by UNDP.
Subscribe
Login
0 Comments
Oldest